Night Light Log

From ESE205 Wiki
Jump to navigation Jump to search

Sept. 1 2018

Ethan

  • (1.5hr) Set up Wiki Pages, Filled out project proposal

Sept. 2 2018

Ethan

  • (0.25hr) Found parts in the Lab

Tony

  • (0.5hr) CADed the case, started the print
  • (0.5hr) Breadboarded Circuit
  • (0.5hr) Soldered Circuit on Perfboard

Sept. 3 2018

Ethan

  • (1.5hr) Wrote project final report

Tony

  • (0.5hr) Retrieved print, assembled final case

Sept. 4 2018

Ethan

  • (0.5hr) Cleanup of Wiki

Night Light Project Page: https://classes.engineering.wustl.edu/ese205/core/index.php?title=Night_Light