Week One: September 3

9/04 1hr – Preliminary Idea Meeting

  • All group discussed ideas we might be interested in pursuing along with feasibilities.
  • Discussed the idea of an internet-connected, sensing, alarm clock that could provide useful morning data

9/06 1 hr - Second Meeting

  • We made our wiki page and weekly log page
  • Finalized our project idea: The Dorm Buddy
  • Discussed goals for our “dorm buddy”:

Week Two: September 9

9/10 - Meeting with Professor Feher and TA Chance

  • Discussed project idea
  • Polished wikis
  • Discussed night light

9/12 - Group Meeting to Finalize Idea

  • honed our idea of making a "dorm buddy"
  • came up with a more detailed project outline
  • discussed our personal goals (what we specifically want to get out of the project), and features we were most interested in having in our creation

9/12 - Meeting with Pro

9/14 - Meeting with Professor Feher and TA Chance from 2:10-3:00 pm

9/15 - Began construction of the circuit and designed the case for the night light from 2:00-5:30m

Week Three: September 16

9/15-9/16 - Brainstormed and Researched Individually: 1 hour

  • We continued brainstorming project ideas and di research on other items on the market
  • Recorded in shared google doc

9/18 - Conference Call to Discuss Project Idea : 9:00-10:30 pm

  • Discussed themes of our idea: safety, personal health, fun
  • Ended with our default idea being an IoT Light Jacket
  • Decided on the use of Raspberry Pi as our go to system for the project
  • Over Particle photon due to its greater versatility including bluetooth application

9/20 - Meeting to work on Gantt Chart and Budget: 9:00-10:00 am, evening

  • worked on Gantt Chart
  • developed a list of things we need to buy
  • finalized the specifics of our project
  • started work on project proposal presentation
  • worked individually on project proposal
  • Kenneth: budget
  • Gillian: Gantt Chart
  • Andre: Project Proposal

9/21 - Finalizing Project Proposal: 12:30 - 2:00

  • Gillian finalized project proposal
  • Kenneth soldered night light circuit

9/21 - Weekly Meeting with Prof. Feher and Chance: 1 hour

  • discussed final project idea
  • set goals for week four

Week Four: September 23

9/25 - Working on Presentation and Finalizing Budget: 1.5 hours

  • Gillian: presentation work
  • Kenneth: finalizing design for night light case

9/26- Basic Setting up of Pi: 1 hour

  • Gillian: set up pi and downloaded latest version of stretch
  • Created project Github
  • Andre: Researched various methods for sensory data collection-2 hours

9/27 - Continuing Set Up of Pi and Printing Night Light: 2 Hours

  • Gillian: continued setting up pi and researching similar pi project libraries (links on project page)
  • Kenneth: worked on 3D printing shell for night light
  • Andre: Continued researching sensory data collection for vest-1 hour

9/28 – "Finishing Proposal"

  • Kenneth: Completed budget / research communication further – 1.25 hour

Goals for Next Week:

  • Be able to ssh into pi
  • Make sure all materials have been ordered
  • Make sure basic pi circuit is functioning
  • Finish night light
  • Make sure everybody is comfortable using pi
  • Establish method that we will work together for the rest of the project (working alone and adding notes to google drive, finding times to work together, etc)

9/29 - Continuing Work on Pi: 2 Hours

  • Gillian worked on pi to try to ssh, but encountered some issues that required software installation which took a while.
  • Currently still facing problems logging in.

9/30 - Continuing fixing the Pi: 1 hour, 15 minutes

  • Kenneth came to lab to try and fix pi. Unsuccessful.

Week Five: September 30

10/1 - Continuing fixing the Pi: 1 hour 30 minutes

  • Gillian and Chance fixed the pi issue

10/2 - Gillian working in Lab: 1 hour 30 minutes

  • can successfully ssh into pi
  • tried multiple times to get the email to send with the IP address, unsuccessful

10/2 – "Kenneth finishing Night light: 30 minutes"

  • had to re-solder battery connections and assemble ()

10/2 - Brief Check-in with project group: 15 minutes

  • updated everyone on progress
  • Andre is going to put his notes about sensors in the google drive
  • Gillian is going to show Kenneth and Andre how to operate the pi
  • ALL materials have been ordered. Vest is in locker


10/3 - Gillian continued work in lab: 1hour, 30 minutes

  • Couldnt figure out how to install ssmpt on pi, so sent Jim an email
  • Without ssmpt, cannot send email with IP address
  • Looked into installing VNC, but Gillian doesn't have space on personal computer to install (if Kenneth and Andre do though, she can walk them through how to do so)
  • Created GitHub for project, and cloned the repo to the pi
  • Found code from project that Gillian tried to get to the pi, download failed, will try again later when she has more time

10/3 - "Kenneth finished ordering all components: 30 minutes"

  • Researching the LED Light Matrix and its connector to the pi.
  • Ordered correct matrix and connector(bonnet)
  • ALL COMPONENTS ORDERED