Smart Blinds Weekly Log
Jump to navigation
Jump to search
Project page: Smart Blinds
Week 1
September 11
0.5hr Sam
- Created a wiki page.
September 12
1hr
Sam and Toby
- Met with TA Will
- Learned the basis of wiki.
- Studied the circuit and built the night light on the breadboard.
- Discussed the material needed for the project.
September 14
2hr Toby
- Created a proposal draft
2hr Sam and Toby
- Met with TA Will
- Finish soldering Night Light on perfboard
- Discussed proposal
- TA gave advise on the proposal
Week 2
September 18
2hr Sam
- Created budget
- Created Gantt Chart
September 19
0.5hr Toby
- Finished the proposal before meeting with the instructor
2hr Sam
- Finalized Gantt Chart and material list
0.5hr Toby and san
- Meet with TA and instructor
September 21
2hr Toby
- Finalized proposal based on instructor's advice
- Created a presentation power point
Week 3
September 24
3hr Sam
- Started to learn Onshape
- Designed rough draft of night light case
September 26
1hr Sam
- Updated Gantt Chart
1.5 hr Toby
- Looked for user interface and AC/DC convertor online
- Updated budget and presentation
September 28
2hr Sam
- Learned additional Onshape techniques
- Finished Night Light Case
Week 4
September 30
2hr Toby
- Ordered material online
- Reviewed programming for Arduino
- Learned the code of Arduino to stepper motor