Smart Blinds Weekly Log

From ESE205 Wiki
Revision as of 17:44, 19 September 2018 by Samlasota (talk | contribs)
Jump to navigation Jump to search

Project page: Smart Blinds

Log

Week 1


September 11
0.5hr Sam

  • Created a wiki page.

September 12
1hr

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

September 14
2hr Toby

  • Created a proposal draft

2hr Sam and Toby

  • Met with TA Will
  • Finish soldering Night Light on perfboard
  • Discussed proposal
  • TA gave advise on the proposal

Week 2


September 18
2hr Sam

  • Created budget
  • Created Gantt Chart

September 19
0.5hr Toby

  • Finished the proposal before meeting with the instructor

2hr Sam

  • Finalized Gantt Chart and material list