Smart Blinds Weekly Log

From ESE205 Wiki
Revision as of 14:42, 19 September 2018 by Toby Liu (talk | contribs) (→‎Log)
Jump to navigation Jump to search

Project page: Smart Blinds

Log

Project page: Smart Blinds

Week 1


September 11
0.5hr Sam

  • Created a wiki page.

September 12
1hr

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

Week 2


September 14
2hr Toby

  • Created a proposal draft

September 14
2hr

  • Meet with TA Will
  • Finish soldering Night Light on perfboard
  • Discussed proposal
  • TA gave advise on the proposal

September 18
2hr Sam

  • Created budget
  • Created Gantt Chart