Smart Blinds Weekly Log

From ESE205 Wiki
Revision as of 19:05, 15 September 2018 by Toby Liu (talk | contribs)
Jump to navigation Jump to search

Project page: Smart Blinds


Log

Week 1


September 11
0.5hr Sam

  • Create a wiki page.

September 12
1hr

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

Week 2