Night Light Log
Jump to navigation
Jump to search
Sept. 1 2018
Ethan
- (1.5hr) Set up Wiki Pages, Filled out project proposal
Sept. 2 2018
Ethan
- (0.25hr) Found parts in the Lab
Tony
- (0.5hr) CADed the case, started the print
- (0.5hr) Breadboarded Circuit
- (0.5hr) Soldered Circuit on Perfboard
Sept. 3 2018
Ethan
- (1.5hr) Wrote project final report
Tony
- (0.5hr) Retrieved print, assembled final case
Sept. 4 2018
Ethan
- (0.5hr) Cleanup of Wiki
Night Light Project Page: https://classes.engineering.wustl.edu/ese205/core/index.php?title=Night_Light