Motion Powered Battery Log
Revision as of 15:41, 16 April 2018 by Katherine.laue (talk | contribs)
Contents
- 1 Week 01/28/18 - 02/02/18:
- 2 Week 02/03/18 - 02/09/18:
- 3 Week 02/10/18 - 02/16/18:
- 4 Week 02/17/18 - 02/23/18:
- 5 Week 02/24/18 - 03/02/18:
- 6 Week 03/03/18 - 03/10/18:
- 7 Week 03/11/18 - 03/17/18:
- 8 Week 03/18/18 - 03/24/18:
- 9 Week 03/25/18 - 03/31/18:
- 10 Week 04/01/18 - 04/07/18:
- 11 Week 04/08/18 - 04/14/18:
- 12 Week 04/15/18 - 04/20/18:
Week 01/28/18 - 02/02/18:
-01/30
- Katherine, Steven and Henry: Splitting up the work, rough draft design for project - 1 hr
-02/01
- Katherine, Steven and Henry: Determine viable parts online - 1 hr
Week 02/03/18 - 02/09/18:
-02/03
- Katherine, Steven and Henry: Finalize project proposal - 2 hr
-02/04
- Henry: Create Gantt chart - 30 min
Week 02/10/18 - 02/16/18:
-02/11
- Katherine, Steven and Henry: Making Google Slides for presentation and finalize the Gantt chart - 2.5 hours
-02/14
- Katherine: Finalize wiki page - 2.5 hrs
- Steven: Writing for wiki page - 1 hr
- Henry: Learning how to use Arduino - 30 min
-02/12
- Katherine, Steven and Henry: Met with John Fordice - 30 min
- Steven: Ordered parts - 20 min
-02/15
- Steven and Katherine: Create Wiki log - 1 hr
- Katherine: Finalize Wiki page- 30 min
- Katherine, Steven and Henry: Finalize slides for presentation - 1 hr
- Katherine, Steven and Henry: Rehearsing presentation - 30 min
Week 02/17/18 - 02/23/18:
-02/26
- Katherine, Steven and Henry: Met with John Fordice - 30 min
-02/19
- Katherine, Steven and Henry: Received materials - 30 min
-02/21
- Katherine, Steven and Henry: Researched design aspects for visual diagram - 2 hrs
-02/23
- Katherine: Updated wiki log - 30 min
Week 02/24/18 - 03/02/18:
-02/26
- Katherine and Steven: Met with John Fordice - 30 min
-02/28
- Katherine: Updated wiki page and wiki log - 1 hr
Week 03/03/18 - 03/10/18:
-03/07
- Katherine: Met with John Fordice - 20 min
- Henry: Met with Mell - 10 min
- Katherine, Steven and Henry: Worked in lab to create first design, got a current - 3 hrs
-03/10
- Katherine: Research USB Connector Converters - 2 hrs
Week 03/11/18 - 03/17/18:
-03/12
- Katherine and Henry: Worked on Design to hold pieces - 2 hrs
Week 03/18/18 - 03/24/18:
-03/19
- Katherine, Steven and Henry: Re-ordered parts - 30 min
-03/20
- Katherine, Steven and Henry: Worked on Solid Works for design - 1 hr
-03/23
- Katherine: calculations - 1 hrs
- Katherine, Steven and Henry: Solid Works - 1hr
Week 03/25/18 - 03/31/18:
-03/27
- Katherine: Meeting with John - 20 min
- Katherine, Steven and Henry: Coiled pipes and calculated dimensions for box - 2 hrs
-03/28
- Katherine and Steven: Finished Solid Works and printed first shelf - 1hr
-03/30
- Katherine, Steven and Henry: worked in lab to print shelf 2 - 1 hr
-03/31
- Steven: Checked on shelf in lab - 20 min
Week 04/01/18 - 04/07/18:
-04/01
- Henry: Went to architecture school to create box - 1 hr
-04/02
- Katherine, Steven and Henry: Met with John (4 pm) - 20 min
- Katherine, Steven and Henry: Worked in Lab to create finished product of shelves (4:20 pm) - 1 hr
- Katherine: Checked on shelves when printing (6:30 pm) - 40 min
- Katherine: Printed remaining shelves and updated wiki log (7:10 pm) - 1 hr
-04/04
- Steven and Henry: Met with Professor Mell - 1 hr
- Katherine: Went to lab to try and print remaining shelves. The printer is out of ink. Emailed John (8:35pm) - 30 min
Week 04/08/18 - 04/14/18:
-04/09
- Katherine: Went to lab to print remaining shelves. Printers were occupied. Worked on solid works to print two shelves at once. - 1 hr
- Katherine, Steven and Henry: Met with John - 20 min
- Katherine, Steven and Henry: Went to lab to print remaining shelves - 1.5 hrs
-04/10
- Katherine and Henry: Went to lab to pick up shelves. Both 3D printers broke - 30 min
- Henry: Met with Professor Feher - 20 min
- Katherine and Steven: Met with John to discuss printing (4 pm) - 30 min
-04/11
- Katherine: Met John at lab to recreate shelves with new dimensions (4 pm) - 1 hr
- Henry and Steven: Finished new design on solid works - 1 hr
- Katherine and Steven: Wrote paragraphs/bullet points for poster - 1.5 hrs
-04/12
- Katherine: Created poster in Microsoft Presentation - 1 hr
- Steven: Went to lab to work on circuits - 2 hrs
-04/13
- Katherine, Steven and Henry: Met at lab to find parts for transformer/LED - 30 min
-04/14
- John(TA): Printed the 4 new shelves
Week 04/15/18 - 04/20/18:
-04/15
- Steven and Henry: Went to lab and put box together with the shelves and pipes - 2 hrs
-04/16
- Katherine: Finished poster - 1.5 hrs
- Katherine: Updated wiki page - 20 min