Motion Powered Battery Log

From ESE205 Wiki
Jump to navigation Jump to search

Week 01/28/18 - 02/02/18:

-01/30

  • Katherine, Steven and Henry: Splitting up the work, rough draft design for project - 1 hr

-02/01

  • Katherine, Steven and Henry: Determine viable parts online - 1 hr

Week 02/03/18 - 02/09/18:

-02/03

  • Katherine, Steven and Henry: Finalize project proposal - 2 hr

-02/04

  • Henry: Create Gantt chart - 30 min

Week 02/10/18 - 02/16/18:

-02/11

  • Katherine, Steven and Henry: Making Google Slides for presentation and finalize the Gantt chart - 2.5 hours

-02/14

  • Katherine: Finalize wiki page - 2.5 hrs
  • Steven: Writing for wiki page - 1 hr
  • Henry: Learning how to use Arduino - 30 min

-02/12

  • Katherine, Steven and Henry: Met with John Fordice - 30 min
  • Steven: Ordered parts - 20 min

-02/15

  • Steven and Katherine: Create Wiki log - 1 hr
  • Katherine: Finalize Wiki page- 30 min
  • Katherine, Steven and Henry: Finalize slides for presentation - 1 hr
  • Katherine, Steven and Henry: Rehearsing presentation - 30 min

Week 02/17/18 - 02/23/18:

-02/26

  • Katherine, Steven and Henry: Met with John Fordice - 30 min

-02/19

  • Katherine, Steven and Henry: Received materials - 30 min

-02/21

  • Katherine, Steven and Henry: Researched design aspects for visual diagram - 2 hrs

-02/23

  • Katherine: Updated wiki log - 30 min

Week 02/24/18 - 03/02/18:

-02/26

  • Katherine and Steven: Met with John Fordice - 30 min

-02/28

  • Katherine: Updated wiki page and wiki log - 1 hr

Week 03/03/18 - 03/10/18:

-03/07

  • Katherine: Met with John Fordice - 20 min
  • Henry: Met with Mell - 10 min
  • Katherine, Steven and Henry: Worked in lab to create first design, got a current - 3 hrs

Voltage picture.jpg Voltage2.jpg Design1.jpg

-03/10

  • Katherine: Research USB Connector Converters - 2 hrs

Week 03/11/18 - 03/17/18:

-03/12

  • Katherine and Henry: Worked on Design to hold pieces - 2 hrs

Week 03/18/18 - 03/24/18:

-03/19

  • Katherine, Steven and Henry: Re-ordered parts - 30 min

-03/20

  • Katherine, Steven and Henry: Worked on Solid Works for design - 1 hr

-03/23

  • Katherine: calculations - 1 hrs
  • Katherine, Steven and Henry: Solid Works - 1hr

Week 03/25/18 - 03/31/18:

-03/27

  • Katherine: Meeting with John - 20 min
  • Katherine, Steven and Henry: Coiled pipes and calculated dimensions for box - 2 hrs

-03/28

  • Katherine and Steven: Finished Solid Works and printed first shelf - 1hr

-03/30

  • Katherine, Steven and Henry: worked in lab to print shelf 2 - 1 hr

-03/31

  • Steven: Checked on shelf in lab - 20 min

Week 04/01/18 - 04/07/18:

-04/01

  • Henry: Went to architecture school to create box - 1 hr

Motion Powered Battery Box.jpg

-04/02

  • Katherine, Steven and Henry: Met with John (4 pm) - 20 min
  • Katherine, Steven and Henry: Worked in Lab to create finished product of shelves (4:20 pm) - 1 hr
  • Katherine: Checked on shelves when printing (6:30 pm) - 40 min
  • Katherine: Printed remaining shelves and updated wiki log (7:10 pm) - 1 hr

Shelf 1.jpg Shelf 2.jpg Shelf 3.jpg