Weekly Log

From ESE205 Wiki
Revision as of 18:55, 13 October 2017 by Jdfeher (talk | contribs)
Jump to navigation Jump to search

Weekly Log Instructions

The weekly log should document the progress of your project. The format should include:

  • Date range of each week.
  • What your group did. If challenges were encountered, mention them.
  • Who did it.
  • How much time was spent doing it.
  • What plans does the group have for the next week.
  • If you are behind, feel as though you are going to face a particularly tough challenge or are going to need help with something, you should mention that as well.