CV Chess Logs
Weekly log:
Week 1 Sept. 9 - 15
Robert Goodloe
- (0.25hr) September 12: Created project page and weekly logs.
Team
- (1hr) September 13: Built night light circuit and designed print-able case. Unsure which dimensions to use exactly on case until we get the perfboard.
Week 2 Sept. 16 - 22
Robert Goodloe
- (0.75hr) September 18: Flashed raspbian wheezy operating system onto SD card to set up Raspberry Pi (rpi). Researched various ways to install/use openCV on rpi.
- (0.5hr) September 19: Updated Wiki to include the two weeks of work done up to this point.