* If you are behind, feel as though you are going to face a particularly tough challenge or are going to need help with something, you should mention that as well. | * If you are behind, feel as though you are going to face a particularly tough challenge or are going to need help with something, you should mention that as well. | ||
+ | |||
+ | |||
+ | [[Category:Guidelines]] |
Revision as of 00:16, 26 September 2017
Weekly Log Instructions
The weekly log should document the progress of your project. The format should include:
- Date range of each week.
- What your group did. If challenges were encountered, mention them.
- Who did it.
- How much time was spent doing it.
- What plan are for the next week.
- If you are behind, feel as though you are going to face a particularly tough challenge or are going to need help with something, you should mention that as well.