Difference between revisions of "Weekly Log"
Jump to navigation
Jump to search
(Created page with "The weekly log should document the progress of your project. The format should include: Date range of each week. What you did. If you encountered challenges doing it, ment...") |
|||
Line 1: | Line 1: | ||
− | + | == Weekly Log Instructions == | |
− | + | '''The weekly log should document the progress of your project. The format should include: | |
− | What | + | * Date range of each week. |
− | + | * What your group did. If challenges were encountered, mention them. | |
− | Who did it. | + | * Who did it. |
− | + | * How much time was spent doing it. | |
− | How much time | + | * What plan are for the next week. |
− | + | * If you are behind, feel as though you are going to face a particularly tough challenge or are going to need help with something, you should mention that as well. | |
− | What | ||
− | |||
− | If you are behind, feel as though you are going to face a particularly tough | ||
− | challenge or are going to need help with something, you should mention that as | ||
− | well. |
Revision as of 00:15, 26 September 2017
Weekly Log Instructions
The weekly log should document the progress of your project. The format should include:
- Date range of each week.
- What your group did. If challenges were encountered, mention them.
- Who did it.
- How much time was spent doing it.
- What plan are for the next week.
- If you are behind, feel as though you are going to face a particularly tough challenge or are going to need help with something, you should mention that as well.