Difference between revisions of "Concussion Coach Log"
Jump to navigation
Jump to search
Darbyhakken (talk | contribs) |
Darbyhakken (talk | contribs) |
||
Line 8: | Line 8: | ||
== Week 2 (9/15/17) == | == Week 2 (9/15/17) == | ||
* solidified logistics with Nathan (all) - 0.75 hours<br /> | * solidified logistics with Nathan (all) - 0.75 hours<br /> | ||
− | * updated gantt chart (Darby) 0.5 hours<br /> | + | * updated gantt chart (Darby)- 0.5 hours<br /> |
− | * research arduino setups (Darby) 2 hours <br /> | + | * research arduino setups (Darby)- 2 hours <br /> |
− | * update project proposal (Darby) 0.5 hours<br /> | + | * update project proposal (Darby)- 0.5 hours<br /> |
− | * created budget (Emma) 1 hour<br /> | + | * created budget (Emma)- 1 hour<br /> |
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Fall 2017 Logs]] | [[Category:Fall 2017 Logs]] |
Revision as of 00:42, 25 September 2017
Week 1 (9/8/17)
- created our wiki page
- met with Nathan and solidified project concept
- formulated project proposal
- created gantt chart
- met with Jim and discussed project logistics
Week 2 (9/15/17)
- solidified logistics with Nathan (all) - 0.75 hours
- updated gantt chart (Darby)- 0.5 hours
- research arduino setups (Darby)- 2 hours
- update project proposal (Darby)- 0.5 hours
- created budget (Emma)- 1 hour