Difference between revisions of "BOARDLOCK"

From ESE205 Wiki
Jump to navigation Jump to search
Line 3: Line 3:
  
  
'''Week 1: September 3rd- September 7th'''
+
'''Week 1: September 3rd- September 7th
 +
'''
 
- Brainstormed ideas
 
- Brainstormed ideas
 
- Confirmed we are using the GPS capability of Rasberry Pi
 
- Confirmed we are using the GPS capability of Rasberry Pi

Revision as of 21:28, 20 September 2018


Week 1: September 3rd- September 7th - Brainstormed ideas - Confirmed we are using the GPS capability of Rasberry Pi -


Week 2: September 10th- September 14th Max: Research (1.5 hours) - Optimal longboard size/


Week 3: September 17th - September 21st