Difference between revisions of "Smart Blinds Weekly Log"

From ESE205 Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
* Discussed the material needed for the project.<br />
 
* Discussed the material needed for the project.<br />
  
===Week 2===
 
----
 
 
<big>'''September 14 '''</big><br/>
 
<big>'''September 14 '''</big><br/>
 
2hr Toby
 
2hr Toby
 
*Created a proposal draft
 
*Created a proposal draft
  
<big>'''September 14 '''</big><br/>
+
2hr Sam and Toby
2hr
+
*Met with TA Will<br />
*Meet with TA Will<br />
 
 
*Finish soldering Night Light on perfboard<br />
 
*Finish soldering Night Light on perfboard<br />
 
*Discussed proposal<br />
 
*Discussed proposal<br />
 
*TA gave advise on the proposal
 
*TA gave advise on the proposal
 +
 +
===Week 2===
 +
----
  
 
<big>'''September 18''' </big><br/>
 
<big>'''September 18''' </big><br/>
Line 36: Line 36:
 
0.5hr Toby
 
0.5hr Toby
 
*Finished the proposal before meeting with the instructor  
 
*Finished the proposal before meeting with the instructor  
 +
2hr Sam
 +
*Finalized Gantt Chart and material list
 
[[Category:Logs]]
 
[[Category:Logs]]
 
[[Category:Fall 2018 Logs]]
 
[[Category:Fall 2018 Logs]]

Revision as of 17:44, 19 September 2018

Project page: Smart Blinds

Log

Week 1


September 11
0.5hr Sam

  • Created a wiki page.

September 12
1hr

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

September 14
2hr Toby

  • Created a proposal draft

2hr Sam and Toby

  • Met with TA Will
  • Finish soldering Night Light on perfboard
  • Discussed proposal
  • TA gave advise on the proposal

Week 2


September 18
2hr Sam

  • Created budget
  • Created Gantt Chart

September 19
0.5hr Toby

  • Finished the proposal before meeting with the instructor

2hr Sam

  • Finalized Gantt Chart and material list