Difference between revisions of "Smart Blinds Weekly Log"

From ESE205 Wiki
Jump to navigation Jump to search
Line 31: Line 31:
 
2hr Sam <br />
 
2hr Sam <br />
 
* Created budget
 
* Created budget
* Created Gantt Chart  
+
* Created Gantt Chart
 +
 
 +
<big>'''September 19''' </big><br/>
 +
0.5hr Toby
 +
*Finished the proposal before meeting with the instructor
 
[[Category:Logs]]
 
[[Category:Logs]]
 
[[Category:Fall 2018 Logs]]
 
[[Category:Fall 2018 Logs]]

Revision as of 14:59, 19 September 2018

Project page: Smart Blinds

Log

Week 1


September 11
0.5hr Sam

  • Created a wiki page.

September 12
1hr

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

Week 2


September 14
2hr Toby

  • Created a proposal draft

September 14
2hr

  • Meet with TA Will
  • Finish soldering Night Light on perfboard
  • Discussed proposal
  • TA gave advise on the proposal

September 18
2hr Sam

  • Created budget
  • Created Gantt Chart

September 19
0.5hr Toby

  • Finished the proposal before meeting with the instructor