Difference between revisions of "Smart Lock Log"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | ==Week 0: (1/ | + | ==Week 0: (1/22-1/28)== |
-January 30, 2018: (Ahmed Hassan, 30 min) | -January 30, 2018: (Ahmed Hassan, 30 min) | ||
*Sketched General Product Prototype | *Sketched General Product Prototype |
Revision as of 20:53, 2 February 2018
Week 0: (1/22-1/28)
-January 30, 2018: (Ahmed Hassan, 30 min)
- Sketched General Product Prototype
- Specified details on product's construction
Week 1: (1/29-2/4)
-January 30, 2018: (Kelvin Xie, 35 min)
- Created project wiki and log
- Entered preliminary project plan
-January 31, 2018: (Group, 1 hour)
- Created basic project outline:
- Components:
- Hardware
- dead bolt mount
- Unlock mechanism
- Microcontroller
- Estimate beacon
- AWS Server
- AWS instance
- HTTPS
- Token authentication system
- Unlock poll/request
- App
- Estimate API
- Server request
- Token handling
- Hardware
- Components:
- Determined delegation of work:
- Each member will be the the lead of one of the above three categories. However, every member will contribute towards all three aspects of the project.
- As it stands now, the leads for each role. are the following:
- Hardware: Kelvin Xie
- AWS Server: Ahmed Hassan
- App: Graham Webb