Difference between revisions of "Concussion Coach Log"
Jump to navigation
Jump to search
Darbyhakken (talk | contribs) |
Darbyhakken (talk | contribs) |
||
Line 5: | Line 5: | ||
* met with Jim and discussed project logistics | * met with Jim and discussed project logistics | ||
− | == Week | + | == Week 3 (9/18/17) == |
* solidified logistics with Nathan (all) - 0.75 hours<br /> | * solidified logistics with Nathan (all) - 0.75 hours<br /> | ||
* updated gantt chart (Darby)- 0.5 hours<br /> | * updated gantt chart (Darby)- 0.5 hours<br /> |
Revision as of 19:40, 25 September 2017
Week 2 (9/11/17)
- met with Nathan and solidified project concept
- formulated project proposal
- created gantt chart
- met with Jim and discussed project logistics
Week 3 (9/18/17)
- solidified logistics with Nathan (all) - 0.75 hours
- updated gantt chart (Darby)- 0.5 hours
- research arduino setups (Darby)- 2 hours
- update project proposal (Darby)- 0.5 hours
- created budget (Emma)- 1 hour