Difference between revisions of "Concussion Coach Log"
Jump to navigation
Jump to search
Darbyhakken (talk | contribs) |
Darbyhakken (talk | contribs) |
||
Line 6: | Line 6: | ||
* met with Jim and discussed project logistics | * met with Jim and discussed project logistics | ||
− | == Week 2 9/15/17 == | + | == Week 2 (9/15/17) == |
* solidified logistics with Nathan<br /> | * solidified logistics with Nathan<br /> | ||
* updated gantt chart<br /> | * updated gantt chart<br /> |
Revision as of 00:33, 20 September 2017
Week 1 (9/8/17)
- created our wiki page
- met with Nathan and solidified project concept
- formulated project proposal
- created gantt chart
- met with Jim and discussed project logistics
Week 2 (9/15/17)
- solidified logistics with Nathan
- updated gantt chart
- research arduino setups
- update project proposal
- created budget