Difference between revisions of "Smart Blinds Weekly Log"
Jump to navigation
Jump to search
(→Week 3) |
|||
Line 58: | Line 58: | ||
*Foundd user interface and AC/DC convertor online | *Foundd user interface and AC/DC convertor online | ||
*Updated budget and presentation | *Updated budget and presentation | ||
+ | |||
+ | <big>'''September 28''' </big><br/> | ||
+ | 2hr Sam | ||
+ | *Learned additional Onshape techniques | ||
+ | *Finished Night Light Case | ||
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Fall 2018 Logs]] | [[Category:Fall 2018 Logs]] |
Revision as of 03:30, 29 September 2018
Project page: Smart Blinds
Week 1
September 11
0.5hr Sam
- Created a wiki page.
September 12
1hr
Sam and Toby
- Met with TA Will
- Learned the basis of wiki.
- Studied the circuit and built the night light on the breadboard.
- Discussed the material needed for the project.
September 14
2hr Toby
- Created a proposal draft
2hr Sam and Toby
- Met with TA Will
- Finish soldering Night Light on perfboard
- Discussed proposal
- TA gave advise on the proposal
Week 2
September 18
2hr Sam
- Created budget
- Created Gantt Chart
September 19
0.5hr Toby
- Finished the proposal before meeting with the instructor
2hr Sam
- Finalized Gantt Chart and material list
0.5hr Toby and san
- Meet with TA and instructor
September 21
2hr Toby
- Finalized proposal based on instructor's advice
- Created a presentation power point
Week 3
September 24
3hr Sam
- Started to learn Onshape
- Designed rough draft of night light case
September 26
1hr Sam
- Updated Gantt Chart
1.5 hr Toby
- Foundd user interface and AC/DC convertor online
- Updated budget and presentation
September 28
2hr Sam
- Learned additional Onshape techniques
- Finished Night Light Case