2hr Sam  
 
2hr Sam  
 
*Finalized Gantt Chart and material list
 
*Finalized Gantt Chart and material list
 +
0.5hr Toby and san
 +
*Meet with TA and instructor
  
<big>'''September 19''' </big><br/>
+
<big>'''September 21''' </big><br/>
0.5hr Toby
+
2hr Toby
*Finalized proposal based on instructor's advice  
+
*Finalized proposal based on instructor's advice
 +
*Created a presentation power point
 
[[Category:Logs]]
 
[[Category:Logs]]
 
[[Category:Fall 2018 Logs]]
 
[[Category:Fall 2018 Logs]]

Revision as of 17:15, 21 September 2018

Project page: Smart Blinds

Week 1

September 11
0.5hr Sam

  • Created a wiki page.

September 12
1hr
Sam and Toby

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

September 14
2hr Toby

  • Created a proposal draft

2hr Sam and Toby

  • Met with TA Will
  • Finish soldering Night Light on perfboard
  • Discussed proposal
  • TA gave advise on the proposal

Week 2

September 18
2hr Sam

  • Created budget
  • Created Gantt Chart

September 19
0.5hr Toby

  • Finished the proposal before meeting with the instructor

2hr Sam

  • Finalized Gantt Chart and material list

0.5hr Toby and san

  • Meet with TA and instructor

September 21
2hr Toby

  • Finalized proposal based on instructor's advice
  • Created a presentation power point