Difference between revisions of "BOARDLOCK"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
'''Week 1: September 3rd- September 7th''' | '''Week 1: September 3rd- September 7th''' | ||
− | + | 1. Brainstorming ideas | |
− | - Decided on BOARDLOCK, envisioning a mappable electric longboard with manual locking ability | + | - Confirmed we want to use the GPS capability of Rasberry Pi |
+ | |||
+ | - Inspired by the convenience of BIRD and LimeBike | ||
+ | |||
+ | 2. Decided on BOARDLOCK, envisioning a single-motor mappable electric longboard with manual locking ability | ||
'''Week 2: September 10th- September 14th''' | '''Week 2: September 10th- September 14th''' | ||
− | Max: Research | + | 1. Max: Research/Finding materials (1.5 hours) |
+ | |||
+ | - Investigated optimal longboard size, best motor, | ||
+ | |||
+ | 2. 9/13: All three of us met with Jim and our TA to finalize our project idea (1 hour) | ||
− | - | + | - We decided to focus on GPS and locking mechanism |
+ | - | ||
'''Week 3: September 17th - September 21st''' | '''Week 3: September 17th - September 21st''' |
Revision as of 21:38, 20 September 2018
Week 1: September 3rd- September 7th
1. Brainstorming ideas
- Confirmed we want to use the GPS capability of Rasberry Pi
- Inspired by the convenience of BIRD and LimeBike
2. Decided on BOARDLOCK, envisioning a single-motor mappable electric longboard with manual locking ability
Week 2: September 10th- September 14th
1. Max: Research/Finding materials (1.5 hours)
- Investigated optimal longboard size, best motor,
2. 9/13: All three of us met with Jim and our TA to finalize our project idea (1 hour)
- We decided to focus on GPS and locking mechanism -
Week 3: September 17th - September 21st