Difference between revisions of "BOARDLOCK"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
[[Category:Fall 2018 Logs]] | [[Category:Fall 2018 Logs]] | ||
− | Max | + | |
+ | '''Week 1: September 3rd- September 7th''' | ||
+ | - Brainstormed ideas | ||
+ | - Confirmed we are using the GPS capability of Rasberry Pi | ||
+ | - | ||
+ | |||
+ | |||
+ | '''Week 2: September 10th- September 14th''' | ||
+ | Max: Research (1.5 hours) | ||
+ | - Optimal longboard size/ | ||
+ | |||
+ | |||
+ | '''Week 3: September 17th - September 21st''' |
Revision as of 21:27, 20 September 2018
Week 1: September 3rd- September 7th - Brainstormed ideas - Confirmed we are using the GPS capability of Rasberry Pi -
Week 2: September 10th- September 14th
Max: Research (1.5 hours)
- Optimal longboard size/
Week 3: September 17th - September 21st