Difference between revisions of "Pi Car Discovery/Logs"

From ESE205 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
[[https://classes.engineering.wustl.edu/ese205/core/index.php?title=Pi_Car_Discovery Project Page Link]]
 
[[https://classes.engineering.wustl.edu/ese205/core/index.php?title=Pi_Car_Discovery Project Page Link]]
 +
 +
 +
 +
 +
  
 
== Week 1 (Sept.3rd ~ Sept.7th) ==
 
== Week 1 (Sept.3rd ~ Sept.7th) ==
Line 36: Line 41:
 
* George and James finished the inside part of the '''Night Light''' design. (1hrs)
 
* George and James finished the inside part of the '''Night Light''' design. (1hrs)
 
* Zimon designed the '''Night Light''' shell. (3hrs)
 
* Zimon designed the '''Night Light''' shell. (3hrs)
 +
 +
  
 
[[Category:Logs]]
 
[[Category:Logs]]
 
[[Category:Fall 2018 Logs]]
 
[[Category:Fall 2018 Logs]]

Revision as of 17:25, 17 September 2018

[Project Page Link]




Week 1 (Sept.3rd ~ Sept.7th)

  • Brainstormed on possible project ideas.
  • Scheduled a meeting with Professor.
  • Decided the best strategies about this project.
  • Aimed at doing Pi Car as our projects.

Week 2 (Sept.10th ~ Sept.14th )

  • James and George finished the Night Light project on the breadboard and made it work. (3hrs)
  • James and George created team weekly logs and project page. (1hrs)
  • Zimon found the purchase link to the puttie car.
  • Discussed plan for week 3 with Dr. Feher and TA David. (0.5hrs)

Videos of Night Light on the breadboard:









Week 3 (Sept.17th ~ Sept.21st)

Monday:

  • James learned how to use wiki and update what we have done on the wiki, project page. (2hrs)
  • George and James finished the inside part of the Night Light design. (1hrs)
  • Zimon designed the Night Light shell. (3hrs)