Difference between revisions of "RFID CheckIn Log"
Zsteinberg (talk | contribs) |
|||
Line 4: | Line 4: | ||
==Week 1: January 21-28== | ==Week 1: January 21-28== | ||
− | This week, we met in class for the second time and were assigned to our project groups. We met briefly to discuss ideas during class, but we did not decide on a final project. On Monday, January 22nd, we met outside of class and decided, after much consideration, that we wanted to do an RFID Check-in System. | + | This week, we met in class for the second time and were assigned to our project groups. We met briefly to discuss ideas during class, but we did not decide on a final project. Originally, we talked about producing a gadget that could produce a properly portioned protein shake and automatically shake the drink for you. We thought a lot about how practical this idea could be and ultimately decided that the project might be too simple. On Monday, January 22nd, we met outside of class and decided, after much consideration, that we wanted to do an RFID Check-in System. We believe that this project will offer a lot of challenge, but will still be something that we can complete with a lot of research and work. |
==Week 2: January 28 - February 4== | ==Week 2: January 28 - February 4== |
Revision as of 20:50, 8 February 2018
Week 1: January 21-28
This week, we met in class for the second time and were assigned to our project groups. We met briefly to discuss ideas during class, but we did not decide on a final project. Originally, we talked about producing a gadget that could produce a properly portioned protein shake and automatically shake the drink for you. We thought a lot about how practical this idea could be and ultimately decided that the project might be too simple. On Monday, January 22nd, we met outside of class and decided, after much consideration, that we wanted to do an RFID Check-in System. We believe that this project will offer a lot of challenge, but will still be something that we can complete with a lot of research and work.
Week 2: January 28 - February 4
This week, we slightly modified our idea after talking with Nathan. We met with him on February 1st to see the lab for the first time, solidify plans for our project, and talk about our plan for the upcoming week. On February 4th, we met to work on our Wiki page, project proposal, and Gantt Chart.
Week 3: February 4-11
This week, we will continue working on our final project proposal, which is due on Friday of this week.
- Completed some basic research about RFID technology to get a better understanding of what materials are needed to complete this project.