Difference between revisions of "Concussion Coach Log"
Jump to navigation
Jump to search
Darbyhakken (talk | contribs) |
Darbyhakken (talk | contribs) |
||
Line 1: | Line 1: | ||
− | == Week 1 (9/ | + | == Week 1 (9/11/17) == |
* created our wiki page <br /> | * created our wiki page <br /> | ||
* met with Nathan and solidified project concept<br /> | * met with Nathan and solidified project concept<br /> |
Revision as of 19:38, 25 September 2017
Week 1 (9/11/17)
- created our wiki page
- met with Nathan and solidified project concept
- formulated project proposal
- created gantt chart
- met with Jim and discussed project logistics
Week 2 (9/15/17)
- solidified logistics with Nathan (all) - 0.75 hours
- updated gantt chart (Darby)- 0.5 hours
- research arduino setups (Darby)- 2 hours
- update project proposal (Darby)- 0.5 hours
- created budget (Emma)- 1 hour