Difference between revisions of "Smarter Door Log"
Jump to navigation
Jump to search
Jostrek123 (talk | contribs) |
Jostrek123 (talk | contribs) |
||
Line 21: | Line 21: | ||
* 1 hour research on texting capabilities from Pi (Johnny) | * 1 hour research on texting capabilities from Pi (Johnny) | ||
** Twilio can send text and image | ** Twilio can send text and image | ||
+ | *Met with Ethan and Professor Fehr, decided to focus on Raspberry Pi setup and figuring out how to text the Raspberry Pi | ||
+ | ** Begin to think about presentation slides | ||
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Spring 2019 Logs]] | [[Category:Spring 2019 Logs]] |
Revision as of 18:27, 4 February 2019
Contents
Link to Project page
Week 1: January 20-26
- 1 hour meeting in class to finalize group members and discuss project ideas
Week 2: January 27 - February 2
- 30 minute group meeting with Ethan and Professor Fehr to discuss specifics of the project
- Discussed completing Night Light and Amazon Web Service Projects
- Planned meeting for the 30th to decide the mechanical portion of the project
- Added the red light to the design of the project, got rid of the locking aspect
- 30 minute group meeting on 1/30 to determine final hardware of project
- 1 hr starting blackjack and downloading software (Katie)
- 1.5 hours setting up Gantt chart and budget
- 30 minute group meeting to finalize wiki project proposal
- 2 hours work on Blackjack, stuck on setting up respository structure (Johnny)
- 2 hours building night light circuit and attempting to set up raspberry pi, got stuck on entering username and password
- Goals for next week: Finish Night Light, Set up Raspberry Pi, Work on Blackjack
Week 3: February 3 - February 9
- 1 hour research on texting capabilities from Pi (Johnny)
- Twilio can send text and image
- Met with Ethan and Professor Fehr, decided to focus on Raspberry Pi setup and figuring out how to text the Raspberry Pi
- Begin to think about presentation slides