Difference between revisions of "Smarter Door Log"
Jump to navigation
Jump to search
Jostrek123 (talk | contribs) |
|||
Line 10: | Line 10: | ||
* Planned meeting for the 30th to decide the mechanical portion of the project | * Planned meeting for the 30th to decide the mechanical portion of the project | ||
* Added the red light to the design of the project, got rid of the locking aspect | * Added the red light to the design of the project, got rid of the locking aspect | ||
+ | *30 minute group meeting on 1/30 to determine final hardware of project | ||
+ | |||
+ | |||
+ | |||
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Spring 2019 Logs]] | [[Category:Spring 2019 Logs]] |
Revision as of 20:22, 1 February 2019
Link to Project page
Week 1: January 20-26
- 1 hour meeting in class to finalize group members and discuss project ideas
Week 2: January 27 - February 2
- 30 minute group meeting with Ethan and Professor Fehr to discuss specifics of the project
- Discussed completing Night Light and Amazon Web Service Projects
- Planned meeting for the 30th to decide the mechanical portion of the project
- Added the red light to the design of the project, got rid of the locking aspect
- 30 minute group meeting on 1/30 to determine final hardware of project