Difference between revisions of "Smart Blinds Weekly Log"

From ESE205 Wiki
Jump to navigation Jump to search
Line 22: Line 22:
 
*Discussed proposal<br />
 
*Discussed proposal<br />
 
*TA gave advise on the proposal
 
*TA gave advise on the proposal
 +
[[File:1.JPG]]
  
 
==Week 2==
 
==Week 2==
Line 41: Line 42:
 
*Finalized proposal based on instructor's advice
 
*Finalized proposal based on instructor's advice
 
*Created a presentation power point  
 
*Created a presentation power point  
[[Category:Logs]]
+
 
[[Category:Fall 2018 Logs]]
 
  
 
==Week 3==
 
==Week 3==
Line 53: Line 53:
 
1hr Sam
 
1hr Sam
 
*Updated Gantt Chart
 
*Updated Gantt Chart
 +
 +
[[Category:Logs]]
 +
[[Category:Fall 2018 Logs]]

Revision as of 18:35, 26 September 2018

Project page: Smart Blinds

Week 1

September 11
0.5hr Sam

  • Created a wiki page.

September 12
1hr
Sam and Toby

  • Met with TA Will
  • Learned the basis of wiki.
  • Studied the circuit and built the night light on the breadboard.
  • Discussed the material needed for the project.

September 14
2hr Toby

  • Created a proposal draft

2hr Sam and Toby

  • Met with TA Will
  • Finish soldering Night Light on perfboard
  • Discussed proposal
  • TA gave advise on the proposal

1.JPG

Week 2

September 18
2hr Sam

  • Created budget
  • Created Gantt Chart

September 19
0.5hr Toby

  • Finished the proposal before meeting with the instructor

2hr Sam

  • Finalized Gantt Chart and material list

0.5hr Toby and san

  • Meet with TA and instructor

September 21
2hr Toby

  • Finalized proposal based on instructor's advice
  • Created a presentation power point


Week 3

September 24
3hr Sam

  • Started to learn Onshape
  • Designed rough draft of night light case

September 26
1hr Sam

  • Updated Gantt Chart