Difference between revisions of "WALL-E Weekly Log"
Jump to navigation
Jump to search
Djsullivan (talk | contribs) |
Djsullivan (talk | contribs) |
||
Line 5: | Line 5: | ||
We met with our TA Andrew and completed the project proposal! We figured out our original Bluetooth option wasn't great, so we are now looking at a Bluetooth shield instead. We also found out we would have to power our robot, so we included batteries in our budget. | We met with our TA Andrew and completed the project proposal! We figured out our original Bluetooth option wasn't great, so we are now looking at a Bluetooth shield instead. We also found out we would have to power our robot, so we included batteries in our budget. | ||
+ | ==September 23== | ||
+ | |||
+ | |||
+ | ==September 30== | ||
+ | |||
+ | |||
+ | ==October 7== | ||
+ | |||
+ | |||
+ | ==October 14== | ||
+ | |||
+ | |||
+ | ==October 21== | ||
+ | |||
+ | |||
+ | ==October 28== | ||
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Fall 2016 Logs]] | [[Category:Fall 2016 Logs]] |
Revision as of 20:48, 16 September 2016
Contents
September 16
We met with our TA Andrew and completed the project proposal! We figured out our original Bluetooth option wasn't great, so we are now looking at a Bluetooth shield instead. We also found out we would have to power our robot, so we included batteries in our budget.