Jump to navigationJump to search- Team Members:
- PhD Supervisor:
- Faculty Supervisor: Arye Nehorai
- Goal:
- Meetings
- Thursday 8:30 AM - 10:00 AM
- Status
- Week 1 -
- Week 2 - Worked on design document to propose the new electric car project
- Week 3 - Researched equipment and components needed for the project
- Week 4 - Purchased equipment and began work on control algorithms for car
- Week 5 - The wrong equipment came and we had to send it back. In the meantime, we wrote code to interpret NMEA strings from our garmin GPS and parse out longitude/latitude.
- Week 6 - Worked on the GPS and algorithm more. The GPS couldn't get a signal inside, but everything seems to be working.
- Week 7