Difference between revisions of "Infrared Sensing Notes FL2010"

From ESE497 Wiki
Jump to navigationJump to search
 
Line 14: Line 14:
 
**Week 5 - The wrong equipment came and we had to send it back. In the meantime, we wrote code to interpret NMEA strings from our garmin GPS and parse out longitude/latitude.
 
**Week 5 - The wrong equipment came and we had to send it back. In the meantime, we wrote code to interpret NMEA strings from our garmin GPS and parse out longitude/latitude.
 
**Week 6 - Worked on the GPS and algorithm more. The GPS couldn't get a signal inside, but everything seems to be working.
 
**Week 6 - Worked on the GPS and algorithm more. The GPS couldn't get a signal inside, but everything seems to be working.
**Week 7
+
**Week 7: Video
 +
***[[media:EvanAndAlex_FL10_DSL720x480.wmv|EvanAndAlex_FL10_DSL720x480.wmv]]

Latest revision as of 17:02, 17 November 2010

  • Team Members:
  • PhD Supervisor:
  • Faculty Supervisor: Arye Nehorai
  • Goal:
  • Meetings
    • Thursday 8:30 AM - 10:00 AM

  • Status
    • Week 1 -
    • Week 2 - Worked on design document to propose the new electric car project
    • Week 3 - Researched equipment and components needed for the project
    • Week 4 - Purchased equipment and began work on control algorithms for car
    • Week 5 - The wrong equipment came and we had to send it back. In the meantime, we wrote code to interpret NMEA strings from our garmin GPS and parse out longitude/latitude.
    • Week 6 - Worked on the GPS and algorithm more. The GPS couldn't get a signal inside, but everything seems to be working.
    • Week 7: Video