Difference between revisions of "Infrared Sensing Notes FL2010"
From ESE497 Wiki
Jump to navigationJump to search (Created page with '* Team Members: * PhD Supervisor: * Faculty Supervisor: Arye Nehorai * Goal: * Meetings ** Thursday 8:30 AM - 10:00 AM ** ---- *Status **Week 1 **Week 2 **Week 3 **Week 4 **We…') |
|||
Line 8: | Line 8: | ||
---- | ---- | ||
*Status | *Status | ||
− | **Week 1 | + | **Week 1 - |
− | **Week 2 | + | **Week 2 - Worked on design document to propose the new electric car project |
− | **Week 3 | + | **Week 3 - Researched equipment and components needed for the project |
− | **Week 4 | + | **Week 4 - Purchased equipment and began work on control algorithms for car |
− | **Week 5 | + | **Week 5 - The wrong equipment came and we had to send it back. In the meantime, we wrote code to interpret NMEA strings from our garmin GPS and parse out longitude/latitude. |
− | **Week 6 | + | **Week 6 - Worked on the GPS and algorithm more. The GPS couldn't get a signal inside, but everything seems to be working. |
**Week 7 | **Week 7 |
Revision as of 19:12, 8 October 2010
- Team Members:
- PhD Supervisor:
- Faculty Supervisor: Arye Nehorai
- Goal:
- Meetings
- Thursday 8:30 AM - 10:00 AM
- Status
- Week 1 -
- Week 2 - Worked on design document to propose the new electric car project
- Week 3 - Researched equipment and components needed for the project
- Week 4 - Purchased equipment and began work on control algorithms for car
- Week 5 - The wrong equipment came and we had to send it back. In the meantime, we wrote code to interpret NMEA strings from our garmin GPS and parse out longitude/latitude.
- Week 6 - Worked on the GPS and algorithm more. The GPS couldn't get a signal inside, but everything seems to be working.
- Week 7