Difference between revisions of "Gatorade Maker Log"
From ESE205 Wiki
(→Week 4 (9/29/17)) |
(→Week 4 (9/29/17)) |
||
Line 12: | Line 12: | ||
*finalize budget<br /> | *finalize budget<br /> | ||
− | [[ | + | [[File:IMG_1346.mov] |
Revision as of 15:25, 27 September 2017
Week 2 (9/15/17)
- Had group issues
- met with jim
Week 3(9/22/17)
- Decided on project
- Met with Jim and Natalie
Week 4 (9/29/17)
- update Gantt Chart (will post)
- research with Jacob
- finalize budget
[[File:IMG_1346.mov]
https://classes.engineering.wustl.edu/ese205/core/index.php?title=File:IMG_1346.mov#filehistory