Difference between revisions of "Smart Lock Log"
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
****Unlock mechanism | ****Unlock mechanism | ||
****Microcontroller | ****Microcontroller | ||
− | **** | + | ****Estimote beacon |
***AWS Server | ***AWS Server | ||
****AWS instance | ****AWS instance | ||
Line 25: | Line 25: | ||
****Unlock poll/request | ****Unlock poll/request | ||
***App | ***App | ||
− | **** | + | ****Estimote API |
****Server request | ****Server request | ||
****Token handling | ****Token handling |
Revision as of 21:27, 2 February 2018
Week 0: (1/22-1/28)
-January 30, 2018: (Ahmed Hassan, 30 min)
- Sketched General Product Prototype
- Specified details on product's construction
Week 1: (1/29-2/4)
-January 30, 2018: (Kelvin Xie, 35 min)
- Created project wiki and log
- Entered preliminary project plan
-January 31, 2018: (Group, 1 hour)
- Created basic project outline:
- Components:
- Hardware
- dead bolt mount
- Unlock mechanism
- Microcontroller
- Estimote beacon
- AWS Server
- AWS instance
- HTTPS
- Token authentication system
- Unlock poll/request
- App
- Estimote API
- Server request
- Token handling
- Hardware
- Components:
- Determined delegation of work:
- Each member will be the the lead of one of the above three categories. However, every member will contribute towards all three aspects of the project.
- As it stands now, the leads for each role. are the following:
- Hardware: Kelvin Xie
- AWS Server: Ahmed Hassan
- App: Graham Webb