== Week of January 22 ==
 
== Week of January 22 ==
* Chance - Brainstormed ideas  
+
* Whole Group - We attended the initial meeting and brainstormed ideas for the project. Informed that Ty Dalinghaus will not be continuing on our project.
 
 
 
 
  
 
== Week of January 29 ==  
 
== Week of January 29 ==  
* Chance - Attended meeting with TA and Prof. Discussed and confirmed new idea of effect pedal run through a Raspberry Pi. Setup and formatted Wiki page and log.  
+
* Whole Group - Discussed detailed ideas and switched from initial idea of a locking mechanism to a guitar pedal after realization of common interest.
 +
* Chance and GraceAnne - Attended meeting with TA and Prof. Discussed and confirmed new idea of effect pedal and made sure of the reality of running it through a Raspberry Pi.  
 +
*Chance - Setup and formatted Wiki page and log.  
 
== Week of February 5 ==  
 
== Week of February 5 ==  
 +
* Whole Group - Made Ghant chart and solidified specifics goals as well as how to build off of the guide we are using which can be found here: https://www.electrosmash.com/pedal-pi That addition is redesigning the Raspberry Pi mechanism so that it handles two separate triggers for two separate effects in one housing.
 +
* Whole Group - Met to discuss and list materials that are needed, taking most of the ideas for what is needed from our guide. Discussed that capacitors and resistors do not need to purchased but can be supplied via the lab.
 +
* Whole Group - Picked up Raspberry Pi and attended tutorial on how to get the Raspberry Pi up and running. Received locker and combo.
 +
 +
*Challenges for Next Week: Challenges for next week are putting together the project proposal for Friday (2/16) and setting up the Pi so we can move ahead with the coding as well as ordering all of the materials following the project proposal.
  
 
== Week of February 12 ==  
 
== Week of February 12 ==  
 +
* Chance - Went in on Sunday evening (2/11) to setup the Pi. While in lab realized that the Pi was lacking a cord for the power supply which cut this session short. Waiting for a cord to continue.
 +
* Chance and GraceAnne - Came in on Tuesday (2/13) to work on setup of the Pi with the power cord that John set out for us on Monday evening.
 +
* Whole Group - Worked on project proposal slides and presentation for Friday.
 +
* Chance - Updated the wiki page with the final objectives, ghant chart, etc because they had not been since we decided on initial idea.
  
 
== Week of February 19 ==  
 
== Week of February 19 ==  

Revision as of 20:54, 13 February 2018

Link to Project Page

Link to Project: https://classes.engineering.wustl.edu/ese205/core/index.php?title=Don%27t_Fret

Week of January 22

  • Whole Group - We attended the initial meeting and brainstormed ideas for the project. Informed that Ty Dalinghaus will not be continuing on our project.

Week of January 29

  • Whole Group - Discussed detailed ideas and switched from initial idea of a locking mechanism to a guitar pedal after realization of common interest.
  • Chance and GraceAnne - Attended meeting with TA and Prof. Discussed and confirmed new idea of effect pedal and made sure of the reality of running it through a Raspberry Pi.
  • Chance - Setup and formatted Wiki page and log.

Week of February 5

  • Whole Group - Made Ghant chart and solidified specifics goals as well as how to build off of the guide we are using which can be found here: https://www.electrosmash.com/pedal-pi That addition is redesigning the Raspberry Pi mechanism so that it handles two separate triggers for two separate effects in one housing.
  • Whole Group - Met to discuss and list materials that are needed, taking most of the ideas for what is needed from our guide. Discussed that capacitors and resistors do not need to purchased but can be supplied via the lab.
  • Whole Group - Picked up Raspberry Pi and attended tutorial on how to get the Raspberry Pi up and running. Received locker and combo.
  • Challenges for Next Week: Challenges for next week are putting together the project proposal for Friday (2/16) and setting up the Pi so we can move ahead with the coding as well as ordering all of the materials following the project proposal.

Week of February 12

  • Chance - Went in on Sunday evening (2/11) to setup the Pi. While in lab realized that the Pi was lacking a cord for the power supply which cut this session short. Waiting for a cord to continue.
  • Chance and GraceAnne - Came in on Tuesday (2/13) to work on setup of the Pi with the power cord that John set out for us on Monday evening.
  • Whole Group - Worked on project proposal slides and presentation for Friday.
  • Chance - Updated the wiki page with the final objectives, ghant chart, etc because they had not been since we decided on initial idea.

Week of February 19

Week of February 26

Week of March 5

Week of March 12

Week of March 19

Week of March 26

Week of April 2

Week of April 9

Week of April 16

Week of April 23

Week of April 30