Difference between revisions of "Smart Lock Log"

From ESE205 Wiki
Jump to navigation Jump to search
m
Line 8: Line 8:
 
*Created project wiki and log
 
*Created project wiki and log
 
*Entered preliminary project plan
 
*Entered preliminary project plan
 +
 +
-January 31, 2018: (Group, 1 hour)
 +
*Created basic project outline:
 +
**Components:
 +
***Hardware
 +
****dead bolt mount
 +
****Unlock mechanism
 +
****Microcontroller
 +
****Estimate beacon
 +
***AWS Server
 +
****AWS instance
 +
****HTTPS
 +
****Token authentication system
 +
****Unlock poll/request
 +
***App
 +
****Estimate API
 +
****Server request
 +
****Token handling
  
  
 
[[Category:Logs]]
 
[[Category:Logs]]
 
[[Category:Spring 2018 Logs]]
 
[[Category:Spring 2018 Logs]]

Revision as of 20:44, 2 February 2018

Week 0: (1/21-1/27)

-January 30, 2018: (Ahmed Hassan, 30 min)

  • Sketched General Product Prototype
  • Specified details on product's construction

Week 1: (1/29-2/4)

-January 30, 2018: (Kelvin Xie, 35 min)

  • Created project wiki and log
  • Entered preliminary project plan

-January 31, 2018: (Group, 1 hour)

  • Created basic project outline:
    • Components:
      • Hardware
        • dead bolt mount
        • Unlock mechanism
        • Microcontroller
        • Estimate beacon
      • AWS Server
        • AWS instance
        • HTTPS
        • Token authentication system
        • Unlock poll/request
      • App
        • Estimate API
        • Server request
        • Token handling