Difference between revisions of "Soil Log"

From ESE205 Wiki
Jump to navigation Jump to search
(Created page with "Category:Logs Category:Fall 2017 Logs")
 
Line 1: Line 1:
 
[[Category:Logs]]
 
[[Category:Logs]]
 
[[Category:Fall 2017 Logs]]
 
[[Category:Fall 2017 Logs]]
 +
==Week 1 (9/4 - 9/8)==
 +
We began talking about the project and our objectives. We met with Natalie in class on Friday and it was brought to our attention that the project may be too easy and not take that long to complete. With this in mind, we began brainstorming different ideas to maker project harder while not over-shooting the bar. Some ideas we have thought about are an app that can connect to the mechanical system, using bluetooth with the arduino to connect the mechanical component to a phone, or adding a more sophisticated mechanical component (specifics not yet thought of).
 +
==Week 2 (9/11 - 9/15)==
 +
Our goal this week was to finalize how we would proceed with our project.

Revision as of 21:50, 19 September 2017

Week 1 (9/4 - 9/8)

We began talking about the project and our objectives. We met with Natalie in class on Friday and it was brought to our attention that the project may be too easy and not take that long to complete. With this in mind, we began brainstorming different ideas to maker project harder while not over-shooting the bar. Some ideas we have thought about are an app that can connect to the mechanical system, using bluetooth with the arduino to connect the mechanical component to a phone, or adding a more sophisticated mechanical component (specifics not yet thought of).

Week 2 (9/11 - 9/15)

Our goal this week was to finalize how we would proceed with our project.