Difference between revisions of "EBOX Log"

From ESE205 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
=== Jordan's Log ===
+
===eBOX Project Page===
 
+
[[eBOX|https://classes.engineering.wustl.edu/ese205/core/index.php?title=EBOX#Link_to_Log]]
=== Nish's Log===
+
=== August 31 ===
 
+
'''The Team''' <br />
=== Chanel's Log ===
+
*(1hr) Discussed the very basic idea of the project at the first class.
 
+
=== September 6 ===
=== Team Log ===
+
'''Jordan''' <br />
 
+
*(0.5hr) Learned the basics of using Wiki. Created the Project Page and Log.
We discussed the very basic idea of the project at the first class (8/31). There was some miscommunication and confusion on how to create this page; however, we are meeting Friday (9/7) before class to make sure we are all on the same page.
+
=== September 7 ===
 
+
'''Team''' <br />
9/7: Meet for 60 minutes (2pm-3pm) to ensure everyone understood the project and could explain it. Read up on the night light project to prepare for today's class
+
*(1hr) Team meeting to discuss the project further in depth and to ensure all the team members truly understood the project. Additionally, read up on the night light project to prepare for class, and checked swipe access to the lab, Urbauer 015.
 
+
=== September 11 ===
 
+
'''Team''' <br />
 +
*(1hr) Extra weekly meeting in the lab. Will look into Arduino vs Raspberry Pi, feasibility of Fast Fourier Transforms (FFT) @40kHz on each, and current literature similar to eBOX [[WUSTL Move to the Groove|https://sites.wustl.edu/ese498vertigodancefloor/]]. Additionally, completed the breadboard for the night light and stored it for safe keeping in the locker.  
 +
=== September 12 ===
 +
'''Jordan''' <br />
 +
*(0.25hr) Added to and reformatted the log to be headed by dates.
 +
*(0.25hr) Read up on Ardunios and Raspberry Pis and their feasibility of FFT @40KHz with an analog to digital converter as well as WUSTL Move to the Groove.
  
  

Revision as of 22:49, 12 September 2018

eBOX Project Page

https://classes.engineering.wustl.edu/ese205/core/index.php?title=EBOX#Link_to_Log

August 31

The Team

  • (1hr) Discussed the very basic idea of the project at the first class.

September 6

Jordan

  • (0.5hr) Learned the basics of using Wiki. Created the Project Page and Log.

September 7

Team

  • (1hr) Team meeting to discuss the project further in depth and to ensure all the team members truly understood the project. Additionally, read up on the night light project to prepare for class, and checked swipe access to the lab, Urbauer 015.

September 11

Team

  • (1hr) Extra weekly meeting in the lab. Will look into Arduino vs Raspberry Pi, feasibility of Fast Fourier Transforms (FFT) @40kHz on each, and current literature similar to eBOX https://sites.wustl.edu/ese498vertigodancefloor/. Additionally, completed the breadboard for the night light and stored it for safe keeping in the locker.

September 12

Jordan

  • (0.25hr) Added to and reformatted the log to be headed by dates.
  • (0.25hr) Read up on Ardunios and Raspberry Pis and their feasibility of FFT @40KHz with an analog to digital converter as well as WUSTL Move to the Groove.


eBOX Project Page: https://classes.engineering.wustl.edu/ese205/core/index.php?title=EBOX#Link_to_Log