Difference between revisions of "Smart Lock Log"
Jump to navigation
Jump to search
Line 45: | Line 45: | ||
*Finalized and uploaded Gantt chart to main project page | *Finalized and uploaded Gantt chart to main project page | ||
*Addressed ethical issues (See main project page) | *Addressed ethical issues (See main project page) | ||
+ | *Added list of key features (See main project page) | ||
[[Category:Logs]] | [[Category:Logs]] | ||
[[Category:Spring 2018 Logs]] | [[Category:Spring 2018 Logs]] |
Revision as of 21:48, 13 February 2018
Week 0: (1/22-1/28)
-January 30, 2018: (Ahmed Hassan, 30 min)
- Sketched General Product Prototype
- Specified details on product's construction
Week 1: (1/29-2/4)
-January 30, 2018: (Kelvin Xie, 35 min)
- Created project wiki and log
- Entered preliminary project plan
-January 31, 2018: (Group, 1 hour)
- Created basic project outline:
- Components:
- Hardware
- dead bolt mount
- Unlock mechanism
- Microcontroller
- Estimote beacon
- AWS Server
- AWS instance
- HTTPS
- Token authentication system
- Unlock poll/request
- App
- Estimote API
- Server request
- Token handling
- Hardware
- Components:
- Determined delegation of work:
- Each member will be the the lead of one of the above three categories. However, every member will contribute towards all three aspects of the project.
- As it stands now, the leads for each role. are the following:
- Hardware: Kelvin Xie
- AWS Server: Ahmed Hassan
- App: Graham Webb
Week 2: (2/5-2/11)
-February 6, 2018 (Group, 1 hour)
- Created Gantt Chart
- Determined a more detailed plan/outline of project (See main project page)
Week 3: (2/12-2/18)
-February 13, 2018 (Kelvin Xie, 30 minutes)
- Finalized and uploaded Gantt chart to main project page
- Addressed ethical issues (See main project page)
- Added list of key features (See main project page)