Difference between revisions of "Smart Lock Log"

From ESE205 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
[https://classes.engineering.wustl.edu/ese205/core/index.php?title=Smart_Lock title=Main_Project_Page
 +
 
==Week 0: (1/22-1/28)==
 
==Week 0: (1/22-1/28)==
 
-January 30, 2018: (Ahmed Hassan, 30 min)
 
-January 30, 2018: (Ahmed Hassan, 30 min)

Revision as of 21:04, 2 February 2018

[https://classes.engineering.wustl.edu/ese205/core/index.php?title=Smart_Lock title=Main_Project_Page

Week 0: (1/22-1/28)

-January 30, 2018: (Ahmed Hassan, 30 min)

  • Sketched General Product Prototype
  • Specified details on product's construction

Week 1: (1/29-2/4)

-January 30, 2018: (Kelvin Xie, 35 min)

  • Created project wiki and log
  • Entered preliminary project plan

-January 31, 2018: (Group, 1 hour)

  • Created basic project outline:
    • Components:
      • Hardware
        • dead bolt mount
        • Unlock mechanism
        • Microcontroller
        • Estimate beacon
      • AWS Server
        • AWS instance
        • HTTPS
        • Token authentication system
        • Unlock poll/request
      • App
        • Estimate API
        • Server request
        • Token handling
  • Determined delegation of work:
    • Each member will be the the lead of one of the above three categories. However, every member will contribute towards all three aspects of the project.
    • As it stands now, the leads for each role. are the following:
      • Hardware: Kelvin Xie
      • AWS Server: Ahmed Hassan
      • App: Graham Webb

Week 2: (2/5-2/11)