Difference between revisions of "Nest Model Log"
m (Protected "Nest Model Log" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))) |
|||
(57 intermediate revisions by 2 users not shown) | |||
Line 110: | Line 110: | ||
== Week of March 4 == | == Week of March 4 == | ||
==== March 6 ==== | ==== March 6 ==== | ||
− | Amanda, finished websockets tutorial, becoming more familiar with lightsail, 1 hour | + | Amanda, finished websockets tutorial, becoming more familiar with lightsail, 1 hour <br> |
+ | Tricia, read through AD wiki tutorial and researched other instruction resources, 1 hour | ||
== Week of March 11 == | == Week of March 11 == | ||
Line 122: | Line 123: | ||
Amanda, playing around more with relay configuration, code for using relay as a switch, 1 hour<br> | Amanda, playing around more with relay configuration, code for using relay as a switch, 1 hour<br> | ||
[[File:Relaytesting.mp4]] | [[File:Relaytesting.mp4]] | ||
+ | |||
+ | ==== March 16 ==== | ||
+ | Tricia, found options for new box case, 1 hr <br> | ||
+ | https://www.platt.com/platt-electric-supply/PVC-Polyester-Enclosures-Junction-Boxes-Screw-Cover/Multiple/4x4x4-PVC-J-Box/product.aspx?zpid=51620 <br> | ||
+ | https://www.platt.com/platt-electric-supply/Polycarbonate-Junction-Box-Screw-Cover/Hoffman/Q131310ABE/product.aspx?zpid=475847 <br> | ||
+ | https://www.homedepot.com/p/Carlon-4-in-x-4-in-x-4-in-PVC-Junction-Box-Case-of-3-E987NR/202205916 <br> | ||
+ | https://www.menards.com/main/electrical/electrical-boxes-covers/electrical-boxes/electrical/electrical-boxes-covers/electrical-boxes/wiegmann-6-x-6-x-4-nongalvanized-steel-screw-cover-pull-box/sc060604rc/p-1444451779633-c-6425.htm?tid=6588014361471946961&ipos=13 <br> | ||
+ | |||
+ | ==== March 17 ==== | ||
+ | Tricia, finished wiring AD converter, need 10k resistor to complete coding, 1 hr | ||
+ | <gallery> | ||
+ | wiring.jpg|Pi3 with AD converter | ||
+ | </gallery> | ||
== Week of March 18 == | == Week of March 18 == | ||
+ | |||
+ | ==== March 24 ==== | ||
+ | Tricia, working on coding AD converter, need help, 1 hr <br> | ||
+ | |||
+ | === Goals for Next Week === | ||
+ | Amanda: "Hello World" of websockets, be able to click something on website and turn something on pi on <br> | ||
+ | Tricia: Finish AtoD converter setup<br> | ||
+ | Edit project proposal if necessary | ||
== Week of March 25 == | == Week of March 25 == | ||
+ | |||
+ | ==== March 25 ==== | ||
+ | Amanda, transferred files/debugged LAMP setup on EC2 Instance, 2 hours<br> | ||
+ | Tricia, finished ADC code for light sensor, 2 hours <br> | ||
+ | |||
+ | ==== March 26 ==== | ||
+ | Amanda, finished setup for helloworld on web interface, 1.25 hours<br> | ||
+ | Next Steps: test websockets (just pip installed websockets on pi, must check other SD card for exact syntax, need to adapt websocket code to python3.5<br> | ||
+ | |||
+ | ==== March 27 ==== | ||
+ | Amanda, attempting to finish websockets using LS, RasPi, EC2 for testing, 3 hours<br> | ||
+ | Next Steps: determine why pi cannot act as server, test tornado framework | ||
+ | |||
+ | ==== March 29 ==== | ||
+ | Amanda, figured out websockets for EC2 hosting, need to actually implement with hardware, 2 hours<br> | ||
+ | Next Steps: see if we can figure out dataduplicity tutorial, otherwise edit second tornado tutorial | ||
== Week of April 1 == | == Week of April 1 == | ||
+ | |||
+ | ==== April 2 ==== | ||
+ | Tricia, circuit box with knockouts ordered | ||
+ | https://www.polycase.com/sk-26 | ||
+ | |||
+ | ==== April 3 ==== | ||
+ | Tricia, adjusted project description to smart outlet | ||
+ | |||
+ | ==== For Next Week ==== | ||
+ | Draft of the design and solution section of final project due Friday<br> | ||
+ | Figure out why pi isn't working (test SD with other pi's, try pizero)<br> | ||
+ | Put code on EC2<br> | ||
+ | Write Tutorial<br> | ||
+ | |||
+ | ==== April 4 ==== | ||
+ | Amanda, troubleshooting pi emailer, 30 min<br> | ||
+ | |||
+ | ==== April 5 ==== | ||
+ | Amanda, fixed pi emailer (from ese205emailer@gmail.com), pushed code to git, fixed old tornado test, 2 hours | ||
+ | Tricia, worked on ADC converter with Keith, 1.5 hours | ||
== Week of April 8== | == Week of April 8== | ||
+ | |||
+ | ==== April 8 ==== | ||
+ | Tricia, worked on debugging code for ADC, 1.5 hours | ||
+ | |||
+ | ==== April 10 ==== | ||
+ | Tricia, finished code and fritzing diagram for ADC, 1 hour <br> | ||
+ | [[File:Adc_diagram.png|thumb|ADC wiring diagram]] | ||
+ | Amanda, debugging dataplicity wormhole, reading up on tornado, 2 hours<br> | ||
+ | |||
+ | ==== April 11 ==== | ||
+ | Amanda, got websockets working with ec2 instance! 1 hour<br> | ||
+ | |||
+ | ==== April 12 ==== | ||
+ | Amanda, got websockets working with relay and LED, 1.5 hours<br> | ||
+ | Amanda, got server start to work on boot, changed web interface, 2 hours<br> | ||
+ | |||
+ | ==== April 14 ==== | ||
+ | Amanda, working on tutorial, 30 min<br> | ||
== Week of April 15== | == Week of April 15== | ||
+ | |||
+ | ==== April 15 ==== | ||
+ | Amanda, finished tutorial, worked on design and solution section 2.5 hours<br> | ||
+ | Tricia, soldered components together, box arrived, 2 hours <br> | ||
+ | |||
+ | ==== April 16 ==== | ||
+ | Tricia, working on poster, 30 min <br> | ||
+ | |||
+ | ==== April 17 ==== | ||
+ | Amanda, testing pizero and pushing relevant code, various minor edits to various items, 1 hour<br> | ||
+ | |||
+ | ==== April 18 ==== | ||
+ | Tricia, soldering to pizero, 1.5 hours <br> | ||
+ | |||
+ | ==== NEXT STEPS ==== | ||
+ | *Finish Poster | ||
+ | *Finish Design and Solution Section | ||
+ | *Work on IP address for pi | ||
+ | *Hardware | ||
+ | *Look at ADC code and determine IO pin for code on the site | ||
== Week of April 22== | == Week of April 22== | ||
+ | ==== April 22 ==== | ||
+ | Amanda, modified websocket code for pizero, tested pizero in gallery, fixed IP shifting, other minor fixes, 4 hours<br> | ||
+ | Amanda, worked on design and solution, corrections to poster, etc., 1 hour<br> | ||
+ | Tricia, soldered parts to pi0 and wired relay to outlet and plug, 4.5 hours <br> | ||
+ | |||
+ | ==== April 23 ==== | ||
+ | Amanda, hooked up outlet with pi and relay, tested (works!), 1.5 hours<br> | ||
+ | <gallery> | ||
+ | FinalBox.JPG | ||
+ | </gallery> | ||
+ | |||
+ | [[File: OutletTest.mp4 | 400px]] | ||
+ | |||
+ | ==== April 24 ==== | ||
+ | Amanda, testing in Lopata, coding other outlet, results and solutions, 1 hour <br> | ||
+ | Amanda, got EC2 -> Pi Communication, 3 hours<br> | ||
+ | |||
+ | |||
+ | ==== April 25 ==== | ||
+ | Tricia, finished wiring ADC and relay to pi0, covered box, 2.5 hours <br> | ||
+ | Amanda, testing pi, working through ADC code and debugging, 3.5 hours <br> | ||
+ | |||
+ | ==== April 26 ==== | ||
+ | Amanda, fixed sensors readings and pin configuration on pi (BCM), 2 hours <br> | ||
+ | |||
+ | ==== April 28 ==== | ||
+ | Amanda, finished software portion of design and solutions and results and solutions, 30 min<br> | ||
== Week of April 29== | == Week of April 29== |
Latest revision as of 14:43, 4 May 2019
Contents
- 1 Week of January 14
- 2 Week of January 21
- 3 Week of January 28
- 4 Week of February 4
- 5 Week of February 11
- 6 Week of February 18
- 7 Week of February 25
- 8 Week of March 4
- 9 Week of March 11
- 10 Week of March 18
- 11 Week of March 25
- 12 Week of April 1
- 13 Week of April 8
- 14 Week of April 15
- 15 Week of April 22
- 16 Week of April 29
- 17 Link to Project page
Week of January 14
January 14
Preliminary meeting for ESE 205, chose group
January 18
First class meeting, finalized groups and gave potential project ideas.
Week of January 21
January 25
Second class meeting, received group TA (Keith Kamons), finalized project idea
Amanda, started Python tutorial, 1 hour
Week of January 28
January 28
Group meeting with TA and professor, received feedback about plausibility of project, outlined details of project plan.
Amanda, Tricia, group meeting, 1 hour
Tricia, started learning python, 30 min
January 30
Group met to work on Wiki page and project proposal, figure out more details of project.
Amanda, Tricia, group meeting, 1 hour
Amanda, finalized Gantt Chart, 45 min
January 31
Starting entry level objectives.
Amanda, started blackjack project, 1 hour
Amanda, continued learning Python, 1 hour
February 1
(See above)
Amanda, continued blackjack project, 1 hour
Amanda and Tricia, full class meeting, 1 hour
February 2
Amanda, set up Raspberry Pi OS and tested SSH, 1.5 hours
SHORT TERM GOALS FOR NEXT WEEK
- Learn Python
- Complete tutorials (Keith sent)
- Start night light
- Start project presentation
Week of February 4
February 5
Amanda, Tricia, review raspberry pi basics, bash, 1 hour
February 6
Amanda, Tricia, group meeting with professor and TA, 30 min
Amanda, testing Raspberry Pi circuit, 1 hour
February 7
Amanda, figured out Raspberry Pi circuit and configuring pi crashing, 1 hour
Tricia, learning python, 1 hour
Week of February 11
February 12
Amanda, worked on project presentation, 30 min
February 13
Amanda, finishing up Blackjack, editing budget, 1.5 hours
Amanda, started outlining site navigation, FSM, 1 hour
Media:Nest_devicepage.jpg
Media:Nest_homeSketch.jpg
Media:Nest_layoutSketch.jpg
Media:Nest_loggedinSketch.jpg
Media:Nest_settingsSketch.jpg
Media:FSM.png
February 14
Tricia, worked on nightlight, still doesn't work, 1.5 hrs
Amanda, set up internal paths using WAMP server to use localhost, 1.5 hrs
February 15
Tricia, worked on nightlight, is now working and soldered together, 2 hrs
Amanda, set up SSHing into pi zero, 1.5 hours
February 16
Amanda, created home page with links to login and signup for web interface, 1 hr
Media:2-16-19Indexpage.png
Amanda, updated gantt chart and presentation, 1 hr
Week of February 18
Goals for this/next week
A to D converter (raspberry pi)
Tricia - blink led using pi
Maybe set up model circuit?
Amanda - try writing script for final product (use diagram)
Figure out php to python
February 20
Group meeting, 30 min
February 21
Amanda, Tricia, worked on hardware of blink LED, 1 hour
February 22
Tricia, worked on blinking LED and blink switch, 2 hours
Blinking Circuit
Circuit with Alternating Input
Amanda, worked on npm init for blackjack, wiped SD card for pi3, 2.5 hours
February 23
Amanda, reset piZero SSH and other, 1 hour
Week of February 25
February 24
Tricia, began modeling circuit with relay, 30 min
February 27
Group meeting, 30 min
February 28
Amanda, working on understanding websockets and ports, 1 hour
March 1
Amanda, setting up websockets, looking at socket.io, 1 hour
Week of March 4
March 6
Amanda, finished websockets tutorial, becoming more familiar with lightsail, 1 hour
Tricia, read through AD wiki tutorial and researched other instruction resources, 1 hour
Week of March 11
Note: Week of Spring Break
March 11
Amanda, worked on general configuration at home, relay module testing, 1 hour
March 13
Amanda, playing around more with relay configuration, code for using relay as a switch, 1 hour
March 16
Tricia, found options for new box case, 1 hr
https://www.platt.com/platt-electric-supply/PVC-Polyester-Enclosures-Junction-Boxes-Screw-Cover/Multiple/4x4x4-PVC-J-Box/product.aspx?zpid=51620
https://www.platt.com/platt-electric-supply/Polycarbonate-Junction-Box-Screw-Cover/Hoffman/Q131310ABE/product.aspx?zpid=475847
https://www.homedepot.com/p/Carlon-4-in-x-4-in-x-4-in-PVC-Junction-Box-Case-of-3-E987NR/202205916
https://www.menards.com/main/electrical/electrical-boxes-covers/electrical-boxes/electrical/electrical-boxes-covers/electrical-boxes/wiegmann-6-x-6-x-4-nongalvanized-steel-screw-cover-pull-box/sc060604rc/p-1444451779633-c-6425.htm?tid=6588014361471946961&ipos=13
March 17
Tricia, finished wiring AD converter, need 10k resistor to complete coding, 1 hr
Week of March 18
March 24
Tricia, working on coding AD converter, need help, 1 hr
Goals for Next Week
Amanda: "Hello World" of websockets, be able to click something on website and turn something on pi on
Tricia: Finish AtoD converter setup
Edit project proposal if necessary
Week of March 25
March 25
Amanda, transferred files/debugged LAMP setup on EC2 Instance, 2 hours
Tricia, finished ADC code for light sensor, 2 hours
March 26
Amanda, finished setup for helloworld on web interface, 1.25 hours
Next Steps: test websockets (just pip installed websockets on pi, must check other SD card for exact syntax, need to adapt websocket code to python3.5
March 27
Amanda, attempting to finish websockets using LS, RasPi, EC2 for testing, 3 hours
Next Steps: determine why pi cannot act as server, test tornado framework
March 29
Amanda, figured out websockets for EC2 hosting, need to actually implement with hardware, 2 hours
Next Steps: see if we can figure out dataduplicity tutorial, otherwise edit second tornado tutorial
Week of April 1
April 2
Tricia, circuit box with knockouts ordered https://www.polycase.com/sk-26
April 3
Tricia, adjusted project description to smart outlet
For Next Week
Draft of the design and solution section of final project due Friday
Figure out why pi isn't working (test SD with other pi's, try pizero)
Put code on EC2
Write Tutorial
April 4
Amanda, troubleshooting pi emailer, 30 min
April 5
Amanda, fixed pi emailer (from ese205emailer@gmail.com), pushed code to git, fixed old tornado test, 2 hours Tricia, worked on ADC converter with Keith, 1.5 hours
Week of April 8
April 8
Tricia, worked on debugging code for ADC, 1.5 hours
April 10
Tricia, finished code and fritzing diagram for ADC, 1 hour
Amanda, debugging dataplicity wormhole, reading up on tornado, 2 hours
April 11
Amanda, got websockets working with ec2 instance! 1 hour
April 12
Amanda, got websockets working with relay and LED, 1.5 hours
Amanda, got server start to work on boot, changed web interface, 2 hours
April 14
Amanda, working on tutorial, 30 min
Week of April 15
April 15
Amanda, finished tutorial, worked on design and solution section 2.5 hours
Tricia, soldered components together, box arrived, 2 hours
April 16
Tricia, working on poster, 30 min
April 17
Amanda, testing pizero and pushing relevant code, various minor edits to various items, 1 hour
April 18
Tricia, soldering to pizero, 1.5 hours
NEXT STEPS
- Finish Poster
- Finish Design and Solution Section
- Work on IP address for pi
- Hardware
- Look at ADC code and determine IO pin for code on the site
Week of April 22
April 22
Amanda, modified websocket code for pizero, tested pizero in gallery, fixed IP shifting, other minor fixes, 4 hours
Amanda, worked on design and solution, corrections to poster, etc., 1 hour
Tricia, soldered parts to pi0 and wired relay to outlet and plug, 4.5 hours
April 23
Amanda, hooked up outlet with pi and relay, tested (works!), 1.5 hours
April 24
Amanda, testing in Lopata, coding other outlet, results and solutions, 1 hour
Amanda, got EC2 -> Pi Communication, 3 hours
April 25
Tricia, finished wiring ADC and relay to pi0, covered box, 2.5 hours
Amanda, testing pi, working through ADC code and debugging, 3.5 hours
April 26
Amanda, fixed sensors readings and pin configuration on pi (BCM), 2 hours
April 28
Amanda, finished software portion of design and solutions and results and solutions, 30 min