Difference between revisions of "Duckling log"
Jump to navigation
Jump to search
Line 45: | Line 45: | ||
[[Category:Fall 2018 Logs]] | [[Category:Fall 2018 Logs]] | ||
− | == Week of Friday, September 28th == | + | == Week of Friday, September 28th == |
+ | |||
+ | Matheus: | ||
+ | |||
+ | Trish: | ||
+ | |||
+ | Tushar: | ||
== Link to Project page == | == Link to Project page == | ||
[[https://classes.engineering.wustl.edu/ese205/core/index.php?title=Duckling Link to Duckling Project Page]] | [[https://classes.engineering.wustl.edu/ese205/core/index.php?title=Duckling Link to Duckling Project Page]] |
Revision as of 16:18, 24 September 2018
This is the log page for the duckling project
Contents
Week of Friday, September 14th
Matheus:
9th- Worked on the breadboard version of the nightlight. (01:30:00) 10th- Created the wiki and the log pages. (00:15:00) 12th - Soldered the perf board for the nightlight project (01:30:00)
Trish:
9th - Worked on the breadboard version of the nightlight. (01:30:00) 12th - Soldered the perf board for the nightlight project (01:30:00) 14th - Worked on the project proposal (1:00:00)
Tushar:
9th - Worked on the breadboard version of the nightlight. (01:30:00) 12th - Soldered the perf board for the nightlight project (01:30:00) 14th - Worked on the project proposal (1:00:00)
Week of Friday, September 21st
Matheus:
Trish:
19th: Worked on proposal objectives and challenges (00:30:00) 20th: Worked on proposal budget and overview, downloaded arduino IDE and read about preliminary arduino projects (00:40:00) 21st: Collaborated with Tushar on Gantt chart (00:20:00) 22nd: Bought USB-C to USB converter to work with Arduino on computer, read usage section of Picar website, got Onshape account and looked in the picar github CAD folder for the onshape files of 3D printer layers and encoder mount (locating files unsuccessful), read about 3D printing, made LED blink using https://picar.readthedocs.io/en/latest/chapters/tutorials/arduino_basics.html, and read Arduino function library at https://www.arduino.cc/reference/en/. (02:00:00)
Tushar:
17th: Looked for ISC25 rotary encoders (00:20:00) 18th: Cleaned up project wiki and log page - formatted and organized layout. (00:30:00) 18th: Worked on nightlight box on Onshape (00:45:00) 19th: Finished nightlight box with Tony (00:25:00) 19th: Tried to outbid user a**s on eBay for the kinect (00:15:00) 20th: Drafted Gantt chart (01:00:00) 21st: Studied directions on Pi Car website to see what needs to be done (01:00:00)
Group :
Week of Friday, September 28th
Matheus:
Trish:
Tushar: