18.3.2 When will my mesh adaptivity stop iterating?

When you create an adaptivity process, you define a sequence of jobs to be run successively. You can specify the number of jobs in the sequence by specifying the maximum number of analysis iterations allowed, . The maximum number of remeshing operations will be –1, because no remeshing will be performed after the final analysis job is run. When you submit the remesh process, ABAQUS/CAE runs each job in the sequence until one of the following conditions is met: